Getting High

August 20, 2011

Lots of varnish today. After dying and blending some of the patches on the 50# I put the first coat on the Cedar Island boat. I had a bit left and kept going on parts for several boats including the old Morris (Kathy, I haven’t forgotten – I’ll trace the thwarts and document details for […]

Read the full article →

Varnished the 50#

August 17, 2011

After digging out the puddled spots of old varnish, sanding them, and a light overall sanding, I got the first coat on. Since this wasn’t a complete strip job, one more coat ought to do it.

Read the full article →

Evidence

July 27, 2011

Now we know who buggered the 50 lb. I’m sure he thought he was doing the right thing but to sign this “restored”? Balls…

Read the full article →

Morning Paddle

July 25, 2011

A Sunday morning paddle in the big White: Down here you have to do it early before the heat becomes unbearable!

Read the full article →

The Other Weekend Project

July 10, 2011

I either lost another weekend or based on the wife’s possible purchases, saved myself about $800. Redwood base (leftover from another table) with ambrosia maple top. The wild grain is the result of a tree that got infested by ambrosia beetles. They bore into the tree making a network of small tunnels and a fungus […]

Read the full article →

The Rib

July 10, 2011

The new rib for the 50 lb is stained and installed. It’s the one to the right of the light one that I removed some of the varnish from. Once it’s all varnished again it should blend in nicely.

Read the full article →

Cedar River Filled

July 10, 2011

Finally got the filler on the Cedar River Cheemaun that I stretched the new canvas on last weekend. Good arm workout rubbing that filler into the weave. After a couple of weeks to cure it’ll be time for paint.

Read the full article →

Just One Rib

July 7, 2011

That’s all the 50 lb needed. Just one. I’ll let the shape set, pull it back out to stain it so it won’t stand out, then tack it in permanently. The odd thing about this boat is I found two ribs that didn’t have any tacks in them. The planking had holes where tacks had […]

Read the full article →

Planking the 50 lb

July 6, 2011

All the patches are in. Now I need to bend in one replacement rib.

Read the full article →

Shuffle

July 5, 2011

The Cedar River Cheemaun came off the top rack and got a new canvas while the Morris went up on the rack after her wood work was completed and the exterior oiled. She soaked up quite a bit, that cedar is just 7 years shy of the century mark.

Read the full article →
Site Meter